PROCESSING OF REQUIRED DEPOSITS AVAILABLE

Acceptance of Order:

ACCEPTANCE OF PRELIMINARY ORDER REQUIRES A TEN PERCENT  NON REFUNDABLE DEPOSIT  (INCLUDED PRELIMINARY PLAN PROCESS)

 





CERTIFIED PLAN PROCESS

TEN PERCENT NON REFUNDABLE DEPOSIT OF THE TOTAL FINAL ORDER TO ACQUIRE BUILDING PERMIT  

Detailed Architectural  floor plan including elevations of the front, rear and sides of the home. Roof elevation along with courtesy porch and garage elevations. Energy Code calculations, BTU calculations for HVAC, Wind Zone calculations along with Load calculations for selected pitched roof.

 


custom



PRODUCTION DEPOSIT

TEN PERCENT (NON REFUNDABLE)  DEPOSIT OF TOTAL FINAL ORDER TO SCHEDULE PRODUCTION . BUILDING PERMIT MUST BE IN PLACE TO SCHEDULE PRODUCTION OF THE MODULAR HOME

 


Model